The cable ship, KOL, will arrive at the cable ground (S13 repair site) on 13 Dec 18 at approximately 0300UTC. Hence, the power re-configuration on S13 will be carried on 13 Dec 18 at 0100UTC After the power reconfiguration, the Power Control will be handed over to KOL. S13 traffic will remain down till the end of the repair operations.